Over them going the direction of the pt on the concrete 16 o c.
Floor joist over concrete.
Building a framed wood floor over an existing concrete slab can provide the space needed for electric wiring heat venting plumbing drain lines and added insulation when remodeling a basement or garage space.
Sleeper joists are wooden boards installed on top of an existing subfloor that are typically used as support for hardwood flooring.
3 4 subfloor over them.
The sleeper joists follow the same arrangement and spacing as the main home joists located under the subfloor.
In this vid we look at the batte.
To install a composite deck over concrete you re going to need a sleeper system.
A slab with this much damage can t be fixed.
Set up a sleeper system.
Luckily we ve got some great outdoor flooring ideas over concrete starting with building a deck.
In most cases.
Floor joists over concrete slab.
Yyyyeeeehaaawww we have just hit over 100 000 views on this vid.
So happy its been of use to soooo many folks out there.
When i do this i will only have about 7 or 8 inches between the concrete.
Then install 24 x 1 1 2 foam between the 2x4 s.
The results look just like a deck but getting them is much easier and less expensive than building a deck from scratch.
Been getting a lot of wonderful information around here lately.
Hopefully you guys can help me with a project i have in the works or at least on the drawing board if you will.
A sleeper system is a substructure made up of joists that sits on the surface of the concrete below the decking.
I believe the irc says 18 min between bottom of joists and floor in crawlspace.
What i want to do is frame a floor over the concrete that is level with the house floor.
Going the opposite direction of the pt on the concrete.
The procedure for installing a floor structure over a slab with 2 by 6 joists can be.
Lay another 2x4 plate around the perimeter and like make said again at 4 5 o c.
Building regulations contain specific requirements for framed floors and you should consult your local planning department before beginning this project.
However because the subfloor may have dips or.
But it can be covered up and this article will show you how.
The procedure for installing a floor structure over a slab with 2 by 6 joists can be adapted to larger joist sizes if more subfloor space is required.