A reduction in the amount of hardware needed.
Floor sheathing at balloon framed walls.
The sheathing offers some additional r value and it s a continuous insulation layer outside of the framing.
The walls are framed with 2x4s in most areas of the house.
And panel sheathing products.
And improved performance because the roof diaphragm is directly attached to the wall system.
So what options exist for the specifier to properly detail the wall to floor intersection.
The technique also requires less labor.
In buildings including residential structures framing systems typically consist of the roof structure that supports the roof.
This method was popular before the 1930s and is still used on occasion for stucco and other masonry walled two story houses because such structures shrink and settle more uniformly than do platform structures.
The framing system is the structure of the building holding up the walls floors and roof.
Deck exterior and interior load bearing walls beams girders posts and floor framing.
Instead of platform framing the walls can be framed taller and joists can hang from the top plate or a ledger attached to the wall figure 1.
From a comfort standpoint here in climate zone 4 we think this will be a good tradeoff to using 2 6 walls that have a moderately higher r value but a bit more thermal bridging.
The international code council icc is a non profit organization dedicated to developing model codes and standards used in the design build and compliance process.
The international codes i codes are the widely accepted comprehensive set of model codes used in the us and abroad to help ensure the engineering of safe sustainable affordable and resilient structures.
No fire stopping is necessary because the stud spaces are enclosed by the floor platforms.
The sheathing shall be shown by experience to pro vide lateral support and shall be adequately fastened.
Framing systems use structural elements and dimensional lumber to support the wall and sheathing.
Platform framing utilizes less wood.
This module also provides for alternate 24 inch spacing of floor wall and roof fram ing where floor and roof trusses are used and accommodates 24 inch spacing of studs where wind loads permit or where larger studs are required for thicker in sulation or heavier floor and roof loads.
Because walls can be fabricated down on the floor the safety level for workers is higher with platform framing.
With balloon frame construction shown below studs run full height from mud sill to the top plate to a maximum of 20 feet.
Additionally smaller pieces of wood can be used on the wall frames.
Framing must transfer all gravity uplift and lateral loads to the foundation.